NEW CONSTRUCTION · AN OWNER-REQUESTED ALTERNATE

A different roof.
A longer view.

A proposed spray polyurethane foam and GE Enduris silicone roof system for Vermeer’s Buford Sales & Service Center—and a new approach for the facilities that may follow.

Architect’s perspective rendering of the planned Vermeer Southeast Buford Sales and Service Center
Project rendering · LS3P architecture permit set, A-251 · The image shows the original plan design.

Prepared
Revision · Preliminary budget proposal
THE EXECUTIVE CASE

A roof is a long-term operating decision.

Vermeer is evaluating more than a different roofing material. It is considering how a new roof can be inspected, serviced and renewed throughout the life of a facility.

01 / WHY CONSIDER THE ALTERNATE

A new building gives us a chance to coordinate the roof from the deck up.

02 / HOW THE SYSTEM WORKS

Every layer has a job. The roof works as a system.

The assembly below covers the main, storage and wash roofs. Open the product panels for manufacturer documents.

Exploded view of the proposed main roof: structural deck, one 3-inch polyiso layer, OSB, SPF averaging 1.75 inches with a 1.5-inch minimum, PC 50 primer, and two white Enduris silicone coats.
Concept illustration. Primer and coating thicknesses are exaggerated for clarity.View full-size graphic ↗
03 / TWO DIFFERENT ROOFING APPROACHES

Compare how each roof is built, checked and cared for.

The practical differences in construction, quality checks and maintenance.

ROOFING QUESTIONPLANNED TPO APPROACHPROPOSED SPF + SILICONE
04 / THE OWNERSHIP PLAN

Renew the surface.
Preserve the investment.

The long-term opportunity is to retain roof layers Vermeer has already paid for. Renewing the protective coating on a sound, suitable assembly can reduce new-material, tear-off, hauling and disposal costs compared with a full reroof—and may reduce disruption to the facility.

Renewal is based on roof condition and manufacturer approval. A warranty ending does not itself require roof replacement; no fixed renewal date or dollar savings is assumed.

05 / THE BUFORD APPLICATION

The scope for Buford.

Project coverage, roof interfaces and closeout responsibilities.

05Explore the planned scopeEquipment, waste removal, coping, drainage and accessClick to expand section
Coping and installation are included.
Carpentry by others.

Waters Edge’s roofing scope excludes carpentry work for roof curbs and parapet-wall nailers. The estimate carries a treated nailer lumber material allowance; installation remains by others.

06 / PROJECT INVESTMENT

Your investment in the Buford roof.

Warranty & inspection +
Project references
    A DESIGN-TEAM DECISION

    Set a new standard for future Vermeer facilities.

    The Buford project can serve as a carefully documented evaluation of an alternative new-construction roof assembly. The proposed system will move forward only through the normal owner, architect, manufacturer and permit review process.